Islanded-operation assessment report
Island mode runs at fixed frequency only: there is no combined assessment of island power balance, frequency deviation and voltage level.
Pick a scheme first — then this column can calculate
This column runs the real engine on your project scheme, and there is none yet — that is why no calculation buttons are shown here (they are not broken). Start with any of the ways below; the fastest is the built-in example (one click, real parameters).
10 kV incoming (200 MVA short-circuit level) → 1250 kVA transformer (Dyn11) → LV main switchboard → busbar → 5 feeders plus a fire/emergency ATS branch. 1000 kW calculated load, cosφ 0.85, power-factor target 0.95.
Load the real example scheme and start calculating →The scheme and its parameters go straight into your browser; replace the data with your own at any time.
Calculator mode is not available for this column yet — use one of the ways below.
In the studio, place devices, wire them and pick models — that becomes your project scheme (drawings / BOM / report can be exported).
Open the studio →Use the chat bubble bottom-right, or Contact us — we will set the example to your site parameters.
Note: every number comes from the engine. With no scheme, nothing is invented here.