Transformer sizing
Load list → required kVA → recommended standard rating (R10), with current and reactive compensation.
Preparation
The exact input requirements follow the required fields on the tool page.
Interface sample · this is a section landing page; tool availability is shown on the cards
Organise the transformer and reactor conditions, and confirm the data each analysis target needs.
For equipment data preparation and early scheme discussion.
Review the matching calculation or check results, the inputs and any unconfirmed items. The actual output depends on the tool once it is wired up.
A single result does not prove the whole scheme compliant, the equipment suitable or the work ready to build. Site conditions, manufacturer data and specialist review still apply.
Read the scope and input requirements first, then open the matching tool. No tool replaces another's engineering check.
Load list → required kVA → recommended standard rating (R10), with current and reactive compensation.
The exact input requirements follow the required fields on the tool page.
Current-limiting effect of a series reactor (IEC 60909): Ik with/without, reduction, terminal voltage, ±10% tolerance sweep.
The exact input requirements follow the required fields on the tool page.
Enter the winding design data (E_rms, f, N, core section A_c) and get the peak flux density Bm, or enter a target Bm and get the turns or the core section needed - no scheme required.
The exact input requirements follow the required fields on the tool page.
Transformer winding temperature rise and hot spot (IEC 60076-7), loss split between iron and copper, and the reactor fault-current waveform with the core saturation characteristic (IEC 60909-0). No scheme needed.
The exact input requirements follow the required fields on the tool page.
Enter the cooling method, rated losses, a loading curve and the ambient temperature; the engine returns top-oil and hot-spot temperature-rise curves and flags them against a hot-spot limit - no scheme needed.
The exact input requirements follow the required fields on the tool page.
Top-oil, winding and hot-spot temperature rise to {p1} against the rated rises and the hot-spot limit - no scheme needed.
The exact input requirements follow the required fields on the tool page.
Transformer loss against load rate, curve and composition, from the engine sweep - no scheme needed.
The exact input requirements follow the required fields on the tool page.
No-load loss P0, load loss Pk and the total loss, load-zone verdict, temperature rise and annual energy loss at your real load — to GB 20052-2020, no scheme required.
The exact input requirements follow the required fields on the tool page.
Tools that are not open yet are rendered non-clickable per site rules; no link that would 404 is provided.
A page existing does not mean the function is accepted; results still need review against the applicable conditions.
Equipment data and operating conditions; the exact fields are defined by each tool.
List missing data as to-be-confirmed first; never invent parameters just to enter a flow.
Separate existing data, assumptions and inputs that still need confirmation.
Use nameplate, design or measurement records; do not compare values of different conventions directly.
Having data is not completeness; completeness comes from checking fields, units, relations and scope of use.
Quick entries only; the page still belongs to the six site sections.
Different tasks may reference the same page; this does not change the page's section.
Move forward and back within the same top-level section; no jumping to another task taxonomy.