ElecSimHub

Life-cycle cost comparison

Put 2-4 schemes on one timeline: purchase price + losses + O&M + discounting to total cost of ownership and break-even years.

Method

Keep load, tariff and discount basis the same in both schemes, otherwise the comparison is not on one timeline. Enter all amounts in USD.

Input sources

User input

Nameplate and system data entered by you.

Standard basis

Formulas and limits come from the stated standard.

Engine result

Two schemes, compared on total lifecycle cost

Put 2–4 schemes on one timeline: purchase price, no-load loss P0, load loss Pk, maintenance cost and discounting roll up into a single TOC (total cost of ownership), and it tells the customer straight which year the expensive scheme catches up with the cheap one. All data comes from your input — this tool has no built-in unit prices, efficiencies or loss factors; missing data is shown as “—”.

Pulls the transformer data you already have on the canvas — you only fill in the prices.
Shared conditions (used by every scheme) · all amounts in USDRecomputed as you type — no button, no request

Keep load, tariff and discount basis the same in both schemes, otherwise the comparison is not on one timeline. Enter all amounts in USD.

Not filled in yet → Operating hours (h/year), Average load factor (%), Energy price (USD/kWh), Discount rate (%/year), Assessment life (years)

Scheme A
Scheme B
At least two complete schemes are needed for a comparison.
Scheme A
—
Not available yet — still missing: Purchase price (USD), No-load loss P0 (kW), Load loss Pk (kW), Maintenance (USD/year), Salvage rate (% of purchase price), Operating hours (h/year), Average load factor (%), Energy price (USD/kWh), Discount rate (%/year), Assessment life (years)
Scheme B
—
Not available yet — still missing: Purchase price (USD), No-load loss P0 (kW), Load loss Pk (kW), Maintenance (USD/year), Salvage rate (% of purchase price), Operating hours (h/year), Average load factor (%), Energy price (USD/kWh), Discount rate (%/year), Assessment life (years)
Life-cycle cost (TOC) comparisonpvF unavailable (fill the shared conditions)
SchemePurchase price (t=0)Annual loss costAnnual maintenanceLoss PVO&M PVSalvage PV (−)TOC (present value)
Scheme A———————
Scheme B———————
user input: Purchase price (t=0) · Annual loss cost · Annual maintenancederived: Loss PV · O&M PV · Salvage PV (−) · TOC (present value)

Present value, in US dollars (USD). Columns marked “user input” come straight from you; the discounted columns are derived with the formulas listed below.

Break-even years — when does the expensive scheme catch up?
Break-even unavailable (need two complete schemes with a lower annual opex on the dearer one).

Break-even is the discounted-payback year of the extra purchase price: pvF(t*) = Δpurchase price / Δannual opex, i.e. t* = −ln(1 − r·pvF)/ln(1+r) for r > 0, and t* = Δpurchase price / Δannual opex when r = 0. “> N years” means it does not happen inside the assessment life —

Baseline = the scheme with the lowest purchase price. For every other scheme we solve purchase price + annual opex × pvF(t) on both sides and report the year the curves cross.

Engine breakdown check — sum check / salvage present valueEngine basis
Load a system scheme first (builder → save scheme).

Values from the LCC engine (study.lccEvaluate.breakdown). Separate from the customer-side TOC above and never fed into it.

Computed charts
Computed charts(drawn from the results above, 0 requests)Scheme A: Purchase price (USD), No-load loss P0 (kW), Load loss Pk (kW), Maintenance (USD/year), Salvage rate (% of purchase price), Operating hours (h/year), Average load factor (%), Energy price (USD/kWh), Discount rate (%/year), Assessment life (years) · Scheme B: Purchase price (USD), No-load loss P0 (kW), Load loss Pk (kW), Maintenance (USD/year), Salvage rate (% of purchase price), Operating hours (h/year), Average load factor (%), Energy price (USD/kWh), Discount rate (%/year), Assessment life (years)
Chart unavailable — no complete scheme yet
Formulas and basis (everything is derived from your inputs)

Your inputs: purchase price, P0, Pk, operating hours h, load factor LF, energy price, discount rate r, life N, maintenance per year, salvage rate.

  • Annual loss energy = (P0 + Pk × LF²) × h [kWh/year] — iron loss is constant, copper loss follows the square of the load factor
  • Annual loss cost = annual loss energy × energy price [USD/year]
  • Annuity present-worth factor pvF = (1 − (1+r)^−N)/r (pvF = N when r = 0)
  • Loss PV = annual loss cost × pvF ; O&M PV = annual maintenance × pvF
  • Purchase price is at t = 0 (not discounted); salvage PV = purchase price × salvage rate × (1+r)^−N
  • TOC (present value) = purchase price + loss PV + O&M PV − salvage PV
  • Break-even year t* solves: purchase price_A + annual opex_A × pvF(t) = purchase price_B + annual opex_B × pvF(t)
  • Fig 1 plots purchase price + annual opex × pvF(t) from t = 0 to N; the salvage credit is shown separately (Fig 2) and is not added to the curve.

Not modelled (stated, not hidden): tariff escalation, inflation, financing/tax/depreciation, replacement cycles, and monthly cash-flow granularity. The tool never substitutes a default price or coefficient for a value you did not enter.

Frequently asked questions
What can this calculator do?
Enter 2–4 schemes with their purchase price, no-load loss P0, load loss Pk, maintenance and life, plus the common discount rate, energy price and annual operating hours. It folds the purchase price, the discounted cost of losses, O&M and residual into one total cost of ownership (TOC) per scheme and returns the TOC ranking, the break-even year between two schemes and loss-cost charts over the life. Typical uses: choosing between a standard and a high-efficiency transformer, comparing copper and aluminium feeders, and justifying an efficiency upgrade. No built-in prices — every value is yours.
How is the total cost of ownership computed?
TOC = purchase price + discounted cost of losses + discounted O&M + discounted residual, where the annual loss cost = (P0 + Pk·(S/Sn)²) × operating hours × energy price and each year is discounted at 1/(1+r)^n with your rate r. The formula and every input are shown so the figure can be reproduced by hand.
What does the break-even year mean?
It is the year in which the higher-purchase-price scheme's cumulative discounted cost drops below the cheaper one's, i.e. when savings on losses and maintenance have repaid the extra capital. It uses the same discount rate and operating hours as the TOC and is shown for the pair of schemes you select.