Industry assumptions — read this before using the numbers
1.Method: one line fault → protection clears it → reclosure, split into three independent quasi-steady operating points. No millisecond transient waveform is solved.
2.Fault injection: the equivalent fault loop is derived from the short-circuit current — Zloop = c·Un/(√3·Ik) for a three-phase fault, Zloop = √3·c·Un/Ik1 for a single-phase-to-ground fault — then the fault impedance is Zf = faultZRatio × Zloop (default 0.1) and the extracted power is S_f = Un²/Zf. The synthetic extraction element is mathematical only: it never takes part in the de-energisation, violation or lost-load checks.
3.Voltage limits: ±7% permissible bus voltage deviation → 0.93 / 1.07 pu (GB/T 12325-2008). Branch loading limit: 100% (GB 50054-2011). Both can be overridden by the engine input.
4.Reclose criterion: recloseSuccess = true only if BOTH the transient branch (after a successful reclose) and the permanent branch (final operating point after a failed reclose) converge, have no overload / undervoltage / overvoltage, and lose less load than ε (default 0.01 kW). Any persisting violation or unrestored load makes it false and is listed item by item.
5.If a stage does not converge → value null plus the reason; if a branch has no current rating → no overload verdict (no guessing). Missing data is always shown as '—'.
6.Fault point: if you leave the reference empty the engine picks the deepest bus (largest hop count from the sources) and trips its upstream branch. Standards: GB/T 14285-2006 · IEC 60909-0:2016 · GB/T 12325-2008 · GB 50054-2011 · DL 755-2001.
Reclose result (every value from the engine)Not run yet — press Run. Nothing is invented while idle.
Not run yet — press Run. Nothing is invented while idle.
Example case (built-in demo topology GRID-10kV → 1250 kVA Dyn11 → LV bus → 600 kW load + 300 kvar PFC). Build your own scheme to replace it; every result value still comes from the engine.