Grid-code compliance & hosting capacity
A clause-by-clause interconnection compliance check plus the hosting capacity of the connection point. The engine reads the study products (load flow, harmonics, PV power quality, protection, LVRT, islanding, short circuit, PQ envelope), compares every clause against the selected standard profile, and reports — for each clause that does not pass — which clause it is, by how much it misses, and what to change.
Tier 1 · Project and standard profile
Tier 2 · Grid and main equipment
Tier 3 · Distributed energy resource (DER)
Tier 4 · Criteria and basis
Reference connection model: this page assembles a standard MV-to-LV interconnection model from the parameters in the four tiers below (grid source → MV switchgear → transformer → LV busbar → load → DER). Every value is your input; every verdict is computed by the engine. Nothing is written back to your scheme.
The engine computes the network; this page only displays what comes back. Every clause verdict comes from the engine, and missing data is shown as “—” rather than 0.