Project economics assessment report
LCC and storage-arbitrage currently support fixed-parameter calculation only: there is no consolidated economic report and no sensitivity-analysis output document.
This page needs a scheme before it can calculate
Every study here (load flow, short circuit, harmonics, cables…) runs the real engine on real engineering data, so a scheme must exist first. There is none yet — so instead of an empty page, here is how to start.
GRID-10kV → 1250 kVA transformer → LV bus → 600 kW load + 300 kvar PFC. Loaded in one click; replace the data with yours at any time.
Load the example and continue →In the studio: place devices, wire them, pick models — that becomes your project scheme (exportable drawings / BOM / report).
Open the studio →Use the chat bubble bottom-right, or Contact us — we will set the example to your site parameters.
Note: every number comes from the engine. With no scheme, nothing is invented.