From equipment conditions to a verifiable selection basis

Kabel · CT/PT · isolasi · pembumian

What this is

Check cables, instrument transformers, insulation and grounding separately, and organise the basis for equipment and line selection.

Who it is for / at what stage

For engineers preparing distribution schemes and checking equipment conditions, and for project and procurement teams gathering data.

What you can review

Review the matching calculation or check results, the inputs and any unconfirmed items. The actual output depends on the tool once it is wired up.

Boundaries

A single result does not prove the whole scheme compliant, the equipment suitable or the work ready to build. Site conditions, manufacturer data and specialist review still apply.

Next step

Choose what you need to check

Read the scope and input requirements first, then open the matching tool. No tool replaces another's engineering check.

Available

Penentuan ukuran kabel & empat pemeriksaan

Pemeriksaan ampasitas / jatuh tegangan / termal / mekanis (GB 50217-2018, IEC 60287).

Preparation

The exact input requirements follow the required fields on the tool page.

Open tool
Belum tersedia

Penentuan ukuran CT / PT

Pemilihan transformator arus dan tegangan: rasio, kelas akurasi dan beban terukur dengan pemeriksaan per item (batas rasio, beban sekunder, faktor batas akurasi, ketahanan termal waktu-singkat dan dinamis) — dihitung oleh mesin, termasuk grafik.

Preparation

The exact input requirements follow the required fields on the tool page.

Belum tersedia

Kalkulator koordinasi isolasi

Masukkan tegangan sistem, tingkat polusi, ketinggian, dan tegangan residu penangkal surja; mesin memilih tingkat isolasi standar (IEC 60071-1), menerapkan koreksi ketinggian (IEC 60071-2 Lampiran H), dan mengembalikan tahan tegangan yang diperlukan serta tingkat standar terkecil yang memenuhinya - tanpa skema.

Preparation

The exact input requirements follow the required fields on the tool page.

Status

Tools that are not open yet are rendered non-clickable per site rules; no link that would 404 is provided.

A page existing does not mean the function is accepted; results still need review against the applicable conditions.

Preparation

Prepare the data, then choose a tool

Supply and load conditions, equipment parameters, line and environment data; the required fields follow the chosen tool.

List missing data as to-be-confirmed first; never invent parameters just to enter a flow.

  1. Confirm voltage, equipment and operating conditions

    Separate existing data, assumptions and inputs that still need confirmation.

  2. Keep the source and unit of each parameter

    Use nameplate, design or measurement records; do not compare values of different conventions directly.

  3. Check the required fields for the chosen tool

    Having data is not completeness; completeness comes from checking fields, units, relations and scope of use.

You can also arrive here from a task entry

Quick entries only; the page still belongs to the six site sections.

Different tasks may reference the same page; this does not change the page's section.

Calculation toolsSolutionsOutputs & selection
Pemilihan & desainKabel · CT/PT · isolasi · pembumian

Continue browsing Pemilihan & desain

Move forward and back within the same top-level section; no jumping to another task taxonomy.