Dimensionnement des câbles et quatre vérifications
Vérifications ampacité / chute de tension / thermique / mécanique (GB 50217-2018, IEC 60287).
Preparation
The exact input requirements follow the required fields on the tool page.
Interface sample · this is a section landing page; tool availability is shown on the cards
Check cables, instrument transformers, insulation and grounding separately, and organise the basis for equipment and line selection.
For engineers preparing distribution schemes and checking equipment conditions, and for project and procurement teams gathering data.
Review the matching calculation or check results, the inputs and any unconfirmed items. The actual output depends on the tool once it is wired up.
A single result does not prove the whole scheme compliant, the equipment suitable or the work ready to build. Site conditions, manufacturer data and specialist review still apply.
Read the scope and input requirements first, then open the matching tool. No tool replaces another's engineering check.
Vérifications ampacité / chute de tension / thermique / mécanique (GB 50217-2018, IEC 60287).
The exact input requirements follow the required fields on the tool page.
Sélection des transformateurs de courant et de tension : rapport, classe de précision et puissance assignée avec les vérifications point par point (limites de rapport, puissance secondaire, facteur limite de précision, tenue thermique de courte durée et tenue dynamique) — calculé par le moteur, graphiques inclus.
The exact input requirements follow the required fields on the tool page.
Saisissez la tension du système, le degré de pollution, l'altitude et la tension résiduelle du parafoudre ; le moteur sélectionne le niveau d'isolement normalisé (IEC 60071-1), applique la correction d'altitude (IEC 60071-2 Annexe H) et renvoie la tenue requise et le plus petit niveau normalisé qui la satisfait - aucun schéma requis.
The exact input requirements follow the required fields on the tool page.
Tools that are not open yet are rendered non-clickable per site rules; no link that would 404 is provided.
A page existing does not mean the function is accepted; results still need review against the applicable conditions.
Supply and load conditions, equipment parameters, line and environment data; the required fields follow the chosen tool.
List missing data as to-be-confirmed first; never invent parameters just to enter a flow.
Separate existing data, assumptions and inputs that still need confirmation.
Use nameplate, design or measurement records; do not compare values of different conventions directly.
Having data is not completeness; completeness comes from checking fields, units, relations and scope of use.
Quick entries only; the page still belongs to the six site sections.
Different tasks may reference the same page; this does not change the page's section.
Move forward and back within the same top-level section; no jumping to another task taxonomy.