ElecSimHub

Interface sample · this is a section landing page; tool availability is shown on the cards

From equipment conditions to a verifiable selection basis

Cables · TC/TP · aislamiento · puesta a tierra

What this is

Check cables, instrument transformers, insulation and grounding separately, and organise the basis for equipment and line selection.

Who it is for / at what stage

For engineers preparing distribution schemes and checking equipment conditions, and for project and procurement teams gathering data.

What you can review

Review the matching calculation or check results, the inputs and any unconfirmed items. The actual output depends on the tool once it is wired up.

Boundaries

A single result does not prove the whole scheme compliant, the equipment suitable or the work ready to build. Site conditions, manufacturer data and specialist review still apply.

Next step

Choose what you need to check

Read the scope and input requirements first, then open the matching tool. No tool replaces another's engineering check.

Available

Dimensionamiento de cables y cuatro verificaciones

Verificaciones de ampacidad / caída de tensión / térmica / mecánica (GB 50217-2018, IEC 60287).

Preparation

The exact input requirements follow the required fields on the tool page.

Open tool
Aún no disponible

Dimensionamiento de CT / PT

Selección de transformadores de corriente y tensión: relación, clase de precisión y carga nominal con las verificaciones ítem por ítem (límites de relación, carga secundaria, factor límite de precisión, resistencia térmica de corta duración y dinámica) — calculado por el motor, gráficos incluidos.

Preparation

The exact input requirements follow the required fields on the tool page.

Aún no disponible

Calculadora de coordinación de aislamiento

Introduzca la tensión del sistema, el grado de contaminación, la altitud y la tensión residual del pararrayos; el motor selecciona el nivel de aislamiento normalizado (IEC 60071-1), aplica la corrección por altitud (IEC 60071-2 Anexo H) y devuelve la tensión soportada requerida y el menor nivel normalizado que la cumple, sin necesidad de esquema.

Preparation

The exact input requirements follow the required fields on the tool page.

Status

Tools that are not open yet are rendered non-clickable per site rules; no link that would 404 is provided.

A page existing does not mean the function is accepted; results still need review against the applicable conditions.

Preparation

Prepare the data, then choose a tool

Supply and load conditions, equipment parameters, line and environment data; the required fields follow the chosen tool.

List missing data as to-be-confirmed first; never invent parameters just to enter a flow.

  1. Confirm voltage, equipment and operating conditions

    Separate existing data, assumptions and inputs that still need confirmation.

  2. Keep the source and unit of each parameter

    Use nameplate, design or measurement records; do not compare values of different conventions directly.

  3. Check the required fields for the chosen tool

    Having data is not completeness; completeness comes from checking fields, units, relations and scope of use.

You can also arrive here from a task entry

Quick entries only; the page still belongs to the six site sections.

Different tasks may reference the same page; this does not change the page's section.

Calculation toolsSolutionsOutputs & selection
Selección y diseñoCables · TC/TP · aislamiento · puesta a tierra

Continue browsing Selección y diseño

Move forward and back within the same top-level section; no jumping to another task taxonomy.